-
Word document preview
Project Cost, Budget and Earned Value
Cost Estimating Procedure (GAO Twelve Steps)
3 downloads per free account, no card needed.
Who this is for
A PMO or project manager who must show an auditor, a funding board or a sponsor that estimates follow a repeatable, documented process.
What is inside
- 20 numbered steps in 6 stages, each with one owner, a record and a timing
- Maps every procedure step to the GAO twelve-step process (verified table)
- Decision routes for failed cross-checks, review findings and rejected estimates
- Contingency set from a risk analysis at a stated confidence level
- Records table with owner, location and retention for 8 estimating records
- Definitions of point estimate, ground rules, contingency and independent estimate
How to use it: Set the thresholds in the bracketed fields (cross-check tolerance, independent estimate threshold) and name the roles that hold each step in your organisation.
Files & formats
- DOCXcost-estimating-procedure.docx42 KB
Opens in Microsoft Word or Excel, Google Docs or Sheets and LibreOffice. Delivered instantly from your browser.
Free downloads & full access
Every account gets 3 free downloads. Re-downloading a template you already have does not count. This template on its own is $12.99, and buying it keeps your free downloads for something else. Full access is a one-time $249 for all 300 templates, for life.
Bought with a different email? Open your account and enter your order number.
Licence
Use and adapt the document inside your own organisation or for your own clients. Do not resell or republish the templates themselves. These templates are original working documents built on the public or openly licensed guidance named here. They are not legal or contractual advice and are not endorsed by its publisher.



